Semiconductor device including electromagnetic interference (EMI) shielding layer and method for manufacturing the semiconductor device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10115674
APP PUB NO 20170077040A1
SERIAL NO

15233915

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

According to one embodiment, in a method for manufacturing a semiconductor device, a semiconductor chip is provided on a first surface of a substrate having the first surface, a second surface opposite to the first surface, and a side surface between the first surface and the second surface. A resin that seals the first surface of the semiconductor chip is formed on the semiconductor chip. A conductive film electrically connectable to a ground potential source is formed on an upper surface of the resin and a side surface of the resin. A metal oxide film or a metal nitride film is formed on the conductive film by depositing metal on the conductive film in an environment containing oxygen or nitrogen.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • TOSHIBA MEMORY CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Takano, Yuusuke Yokkaichi Mie, JP 19 90
Watanabe, Takeshi Yokkaichi Mie, JP 621 5549

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 30, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 30, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00