Upgraded ebullated bed reactor with increased production rate of converted products

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11414607
APP PUB NO 20170081599A1
SERIAL NO

15258653

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An ebullated bed hydroprocessing system is upgraded using a dual catalyst system that includes a heterogeneous catalyst and dispersed metal sulfide particles to increase rate of production of converted products. The rate of production is achieved by increasing reactor severity, including increasing the operating temperature and at least one of throughput or conversion. The dual catalyst system permits increased reactor severity and provides increased production of converted products without a significant increase in equipment fouling and/or sediment production. In some cases, the rate of production of conversion products can be achieved while decreasing equipment fouling and/or sediment production.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HYDROCARBON TECHNOLOGY & INNOVATION LLC1501 NEW YORK AVENUE LAWRENCEVILLE NJ 08648

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Mountainland, David M Princeton, US 12 38
Rueter, Michael A Plymouth Meeting, US 18 203
Silverman, Brett M Salt Lake City, US 12 112
Smith, Lee Pleasant Grove, US 57 1028

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 16, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 16, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 16, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00