Implantable biocompatible reactor

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10316284
APP PUB NO 20170081626A1
SERIAL NO

15126236

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention concerns a bioreactor obtained by compressing a mixture of an enzyme, a conductor and chitosan. The conductor can consist of carbon nanotubes. This bioreactor can be produced according to the following steps: preparing a mixture of powders in which the proportion of enzyme powder relative to a carbon nanotube powder is of the order of 50/50 by weight; preparing a viscous solution of chitosan in a ratio of 5 to 15 (in mg) of chitosan to 0.75 to 1.25 (in ml) of acetic acid diluted to 0.4 to 0.6% by volume in water; adding the viscous chitosan to the mixture of powders in a proportion be weight of 3 to 5 of powder to 5 to 10 of chitosan; carrying out a first compression followed by light grinding; carrying out a second compression to produce a pellet; and drying at ambient temperature.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • UNIVERSITE GRENOBLE ALPES

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cinquin, Philippe La Tronche, FR 51 1906
El, Ichi Sarra La Tronche, FR 2 3
Martin, Donald K La Tronche, FR 3 17
Zebda, Abdelkader La Tronche, FR 8 4

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 11, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 11, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00