Considering a frequency of access to groups of tracks and density of the groups to select groups of tracks to destage

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10120811
APP PUB NO 20170091110A1
SERIAL NO

14868917

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided are a computer program product, system, and method for considering a frequency of access to groups of tracks and density of the groups to select groups of tracks to destage. One of a plurality of densities for one of a plurality of groups of tracks is incremented in response to determining at least one of that the group is not ready to destage and that one of the tracks in the group in the cache transitions to being ready to destage. A determination is made of a group frequency indicating a frequency at which tracks in the group are modified. At least one of the density and the group frequency is used for each of the groups to determine whether to destage the group. The tracks in the group in the cache are destaged to the storage in response to determining to destage the group.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • IBM CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ash, Kevin J Tucson, US 264 1700
Gupta, Lokesh M Tucson, US 542 3373

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 6, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 6, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00