Multiple pre-clean processes for interconnect fabrication

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9831182
SERIAL NO

14966248

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of making an interconnect structure includes forming an opening within a dielectric material layer disposed on a substrate including a conductive material, the opening extending from a first surface to a second surface of the dielectric material layer and being in contact with a portion of the substrate; performing a plasma treatment process to chemically enrich exposed surfaces of the dielectric material that line the opening to form a chemically-enriched dielectric surface layer that included an element in a higher concentration than a remaining portion of the dielectric material layer; performing a chemical treatment process to remove a metal contact product from the portion of the substrate that is in contact with the opening; and disposing a conductive material in the opening to substantially fill the opening and form the interconnect structure.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • INTERNATIONAL BUSINESS MACHINES CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Spooner, Terry A Clifton Park, US 91 1106
Wang, Wei Yorktown Heights, US 2530 15886
Yang, Chih-Chao Glenmont, US 1033 7530

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 28, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 28, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00