III-V MOSFET with self-aligned diffusion barrier

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9853109
SERIAL NO

15135655

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method is presented for forming a diffusion barrier in a field effect transistor with a source. A raised source is formed at least partially on the source with the raised source comprising III-V material. An interfacial layer is formed at least partially on the raised source with the interfacial layer comprising silicon or germanium. A metal layer is formed at least partially on the interfacial layer with the metal layer comprising transition metal. The diffusion barrier is formed at least partially on the raised source with the diffusion barrier layer comprising transition metal from the metal layer bonded to silicon or germanium from the interfacial layer. Similar processing forms a corresponding diffusion barrier on a raised drain.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • INTERNATIONAL BUSINESS MACHINES CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chan, Kevin K Staten Island, US 229 4005
Cheng, Cheng-Wei White Plains, US 142 576
Chu, Jack Oon Manhasset Hills, US 66 4184
Sun, Yanning Scarsdale, US 51 352
Yau, Jeng-Bang Yorktown Heights, US 144 1328

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 26, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 26, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00