Replacement gate FinFET process using a sit process to define source/drain regions, gate spacers and a gate cavity

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9768272
APP PUB NO 20170092735A1
SERIAL NO

14870936

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A replacement gate FinFET manufacturing process in which the source/drain regions, gate structure and gate spacer are all defined by utilizing a single sidewall image transfer technique is provided. In the present application, the source/drain region (i.e., area) are defined by a mandrel structure, while the area for the functional gate structure are defined by the distance between spacers that are located on a pair of neighboring mandrel structures. The gate spacer is defined by the spacer present on the mandrel structures. In some embodiments, semiconductor fin erosion due to gate and gate spacer formation can be reduced or even eliminated.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • INTERNATIONAL BUSINESS MACHINES CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hashemi, Pouya White Plains, US 599 4445
He, Hong Schenectady, US 1174 7723
Reznicek, Alexander Troy, US 1406 11120
Yamashita, Tenko Schenectady, US 599 4947

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 19, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 19, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00