Apparatus for balancing battery power

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10027135
APP PUB NO 20170093183A1
SERIAL NO

15262781

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An apparatus for balancing battery power can include: a battery selection circuit coupled to N batteries, where the battery selection circuit is configured to couple one of the N batteries to a charge and discharge port, where N is an integer greater than 1; a bi-directional power converter having a first terminal coupled to the charge and discharge port, and a second terminal coupled to a storage capacitor; N detection circuits corresponding to the N batteries, where each of the N detection circuits is configured to detect a state of a corresponding of the N batteries; and a control circuit configured to control the battery selection circuit to couple a selected battery to the charge and discharge port, and to charge or discharge the selected battery through the bi-directional power converter to maintain a voltage of the storage capacitor to be within a predetermined range.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NANJING SILERGY SEMICONDUCTOR (HONG KONG) TECHNOLOGY LTDUNIT 701 7/F CITICORP CENTRE 18 WHITFIELD ROAD CAUSEWAY BAY 999077

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Shen, Zhiyuan Hangzhou, CN 36 137

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 17, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 17, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00