Pipeline multiplexer loop architecture for decision feedback equalizer circuits

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9692618
APP PUB NO 20170093601A1
SERIAL NO

14870340

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Circuits, devices, methods for decision feedback equalization are described. A decision feedback circuit can include L N-tap decision feedback equalizer (DFE) branches. The L N-tap DFE branches can include K unrolled DFE branches, and L−K unfolded DFE branches. Each DFE branch can include a pre-computation stage configured to generate a set of tap-adjusted inputs, each tap-adjusted input corresponding to a possible value for at least one previous output of the same DFE branch. Each unrolled DFE branch can include a multiplexer circuit having selection lines for selecting from the set of tap-adjusted inputs for the unrolled DFE branch, the selection lines being connected to outputs of other DFE branches. Each unfolded DFE branch can include a multiplexer circuit configured to select at least one output from the set of tap-adjusted inputs based on tap-adjusted inputs from other DFE branches.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • HUAWEI TECHNOLOGIES CO., LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ho, Huong Woodlawn, CA 9 33

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 27, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 27, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00