Method of fabricating a tamper-respondent assembly with region(s) of increased susceptibility to damage

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10271434
APP PUB NO 20170094805A1
SERIAL NO

15249676

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Methods of fabricating tamper-respondent assemblies provided which include a tamper-respondent electronic circuit structure. The tamper-respondent electronic circuit structure includes a tamper-respondent sensor. The tamper-respondent sensor includes, for instance, at least one flexible layer having opposite first and second sides, and circuit lines forming, at least in part, at least one tamper-detect network, such as one or more resistive networks. The circuit lines are disposed on at least one of the first side or the second side of the at least one flexible layer. At least one region of the tamper-respondent sensor is fabricated with increased susceptibility to damage from mechanical stress associated with a tamper event. The at least one region of increased susceptibility to damage facilitates detection of the tamper event by the tamper-respondent sensor.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • IBM CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Dangler, John R Rochester, US 124 401
Long, David C Wappingers Falls, US 163 2411
Peets, Michael T Staatsburg, US 52 772

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 23, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 23, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00