Synchronous input/output replication of data in a persistent storage control unit

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10068001
APP PUB NO 20170097976A1
SERIAL NO

15181548

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Aspects include synchronous input/output (I/O) replication of data. A synchronous I/O request is received from an operating system (OS) by firmware on a server. A plurality of synchronous I/O mailbox commands is transmitted by the firmware to a plurality of persistent storage control unit (SCU) nodes. The content of each of the plurality of synchronous I/O commands is based on the synchronous I/O request. A unit of work in the OS corresponding to the synchronous I/O request remains active at least until the synchronous I/O request is completed. It is determined, by the firmware, that determining that each of the plurality of persistent SCU nodes have completed their respective synchronous I/O commands. Based on the determining, the firmware indicates to the OS that the synchronous I/O request is completed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • IBM CORPORATION

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Craddock, David F New Paltz, US 100 3451
Glendening, Beth A Poughkeepsie, US 41 362
Kalos, Matthew J Tucson, US 266 3407
Sutton, Peter G Lagrangeville, US 120 1579
Yudenfriend, Harry M Poughkeepsie, US 222 4572

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 4, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 4, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00