ESD device compatible with bulk bias capability

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9673190
SERIAL NO

14873859

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A device having an electrostatic discharge structure includes a bulk substrate having a first dopant conductivity, first wells formed adjacent to a surface of the bulk substrate, including a second dopant conductivity, and second wells formed adjacent to the surface of the bulk substrate within the first wells, including the first dopant conductivity. A supply bus is formed in one of the first wells outside the second well. A ground bus has a first portion formed in another first well outside the second well, and a second portion is formed inside the second well such that a charge input to the second wells is dissipated without accumulating in the bulk substrate.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • INTERNATIONAL BUSINESS MACHINES CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cheng, Kangguo Schenectady, US 3073 29791
Doris, Bruce B Slingerlands, US 796 13250
Hook, Terence B Terence, US 210 1686
Kerber, Pranita Mount Kisco, US 101 715
Khakifirooz, Ali Los Altos, US 842 11906
Pranatharthiharan, Balasubramanian Watervliet, US 225 1263
Shahidi, Ghavam G Pound Ridge, US 396 8125

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 6, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 6, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00