Evaluation of predictions in the absence of a known ground truth

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10915826
APP PUB NO 20170103331A1
SERIAL NO

15386608

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Disclosed is a novel system, and method to evaluate a prediction of a possibly unknown outcome out of a plurality of predictions of that outcome. The method begins with accessing a particular prediction of an outcome out of a plurality of predictions of that outcome in which the outcome may be unknown. Next, a subsample of the plurality of predictions of the outcome is accessed. The subsample can possibly include the particular prediction. A consensus prediction of the outcome based on the subsample of the plurality of predictions is determined. A proximity of the particular prediction to the consensus prediction is determined Each prediction is ranked out of the plurality of predictions in an order of a closest in proximity to the consensus prediction to a farthest in proximity to the consensus prediction.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • INTERNATIONAL BUSINESS MACHINE CORPORATION

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bilal, Erhan Astoria, US 12 14
Stolovitzky, Gustavo Riverdale, US 8 62

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 9, 2024
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 9, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 9, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00