Filter element with air-bleed conduit

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10807026
APP PUB NO 20170106317A1
SERIAL NO

14885081

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A filter element includes a first end cap, a second end cap, and an intermediate end cap disposed between the first end cap and the second end cap. A ring of first filter media circumscribing a first central cavity is disposed between the first end cap and the intermediate end cap. A ring of second filter media is disposed between the intermediate end cap and the second end cap. The filter element also includes an air-bleed conduit axially extending through the first central cavity and comprising a first portion integrally formed with the first end cap and a second portion integrally formed with the intermediate end cap and configured to connect to the first portion thereby forming a conduit for transmitting fluid.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MANN+HUMMEL FILTRATION TECHNOLOGY US LLC1 WIX WAY GASTONIA NC 28054

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Rhyne, Gregory K Stanely, US 10 71
Roll, Mark A Bessemer City, US 33 193
Stamey,, Jr Willie L Kings Mountain, US 27 103

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 20, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 20, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00