Friction adjustment interface between two parts made of nickel or nickel or cobalt-chromium alloy that are in relative motion against one another at high temperature

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10113224
APP PUB NO 20170107603A1
SERIAL NO

15294092

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An adjustment interface inserted between a first part made of nickel or made of nickel alloy or made of cobalt-chromium alloy in relative motion with a second part made of nickel or made of nickel alloy or made of cobalt-chromium alloy. The interface includes a first adjustment layer on one of the two parts and has a composition that makes it possible, with the friction with the other part, to create a glaze-type layer. A second adjustment layer is deposited on the second part for cooperation with the first layer to act as a catalyst for the oxide formed by friction with the first layer. The first glaze layer of the interface improves the sliding of the parts under friction. The catalyst function provided by the second layer makes it possible to stabilize the oxide formed by friction and to thus ensure a lubrication function over an extended high-temperature range.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
AIRBUS OPERATIONS (S A S )31060 TOULOUSE

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Poupon, Cédric Colomiers, FR 5 10

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 30, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 30, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00