Human exoskeleton devices for heavy tool support and use

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10327536
APP PUB NO 20170119132A1
SERIAL NO

15339293

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An exoskeleton includes strapping for coupling the exoskeleton to a wearer. The exoskeleton also includes a hip structure, a thigh link rotatably connected to the hip structure and a shank link rotatably connected to the thigh link. The weight of the exoskeleton is transferred to a surface on which the exoskeleton is standing through the hip structure, the thigh link and the shank link. An arm brace supports an arm of the wearer, and a telescopic link is rotatably connected to the arm brace. An energy storage device delivers power to a tool through a conduit, and a conduit-energy storage device coupling connects the conduit to the energy storage device.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
EKSO BIONICS INC1414 HARBOUR WAY SOUTH SUITE 1201 RICHMOND CA 94804

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Amundson, Kurt Berkeley, US 25 611
Angold, Russ American Canyon, US 10 225
Fleming, Nicholas Oakland, US 10 88
Lubin, James Oakland, US 11 173
Mastaler, Tom Hercules, US 5 101
Meadows, Chris Richmond, US 6 70
Pruess, Adam Santa Rosa, US 1 26
Solano, Mario Richmond, US 6 105
Sweeney, Matt Sacramento, US 29 113

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 25, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 25, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00