Transition metal-noble metal complex oxide catalyst for dehydrogenation prepared by one-pot synthesis and use thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10307737
APP PUB NO 20170120222A1
SERIAL NO

15339082

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Disclosed are a complex oxide catalyst for dehydrogenation, a method of preparing the same, and use thereof, wherein the catalyst includes a first transition metal selected from the group consisting of gallium, vanadium, chromium, manganese, molybdenum, and zinc, a hydrogen-activating metal including at least one selected from the group consisting of Groups 8, 9, 10, and 11 elements in a periodic table, and alumina, the amount of the first transition metal being 0.1 wt % to 20 wt %, the amount of the hydrogen-activating metal being 0.01 wt % to 2 wt %, based on the amount of the alumina, the first transition metal being loaded on the alumina, and the hydrogen-activating metal being surrounded by the alumina.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SK INNOVATION CO., LTD.; KOREA ADVANCED INSTITUTE OF SCIENCE AND TECHNOLOGY

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cheon, Young Eun Daejeon, KR 19 9
Choi, Min Kee Daejeon, KR 6 18
Im, Ju Hwan Daejeon, KR 13 15
Kim, Tae Jin Seoul, KR 138 1000
Lee, Chang Q Daejeon, KR 12 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 4, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 4, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00