Loading train for bulk material

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10252731
APP PUB NO 20170120936A1
SERIAL NO

15301998

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A loading train (1) consists of at least two loading wagons (2, 3) for transporting and storing bulk material, each having a wagon frame (5) supported on on-track undercarriages (4), a storage box (6) with a bottom conveyor belt (8) which is situated in the bottom region of the storage box and extends in the longitudinal direction (7) of the wagon, and a pivotable transfer conveyor belt (9) adjoining the bottom conveyor belt (8) and projecting beyond the wagon frame (5). A tilt protection device (11) is provided between the front-most, first loading wagon (3)—with regard to a transport direction (10) of the bottom conveyor belt (8)—and the following, second loading wagon (2). The tilt protection device (11) is designed for contacting the rearward wagon frame end of the first loading wagon (3) in order to block an upward movement of the wagon frame (5).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PLASSER & THEURER EXPORT VON BAHNBAUMASCHINEN GESELLSCHAFT M B H1010 WIEN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hoetzendorfer, Patrick Engerwitzdorf, AT 7 3

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 9, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 9, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00