Data transfer between data storage libraries

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10067711
APP PUB NO 20170123672A1
SERIAL NO

14929385

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Transferring data from a first data storage cartridge of a first data storage library to a second data storage library. The first library includes a first data storage drive, the second library includes a second data storage drive. A mounting of the first data storage cartridge into the first data storage drive is initiated. A network connection between the first and second data storage drives, with both data storage drives operating in a data transfer mode, is initiated. A mounting of a second data storage cartridge into the second data storage drive is initiated. A copying of the data content of the first data storage cartridge onto the second data storage cartridge via the network connection is initiated. A deletion of the data of the first data storage cartridge is initiated.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • INTERNATIONAL BUSINESS MACHINE CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Freitag, Bernd Partenheim, DE 23 68
Goodman, Brian G Tucson, US 70 932
Krick, Frank Ockenheim, DE 73 447
Rueger, Erik Ockenheim, DE 182 727

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 4, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 4, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00