Lift pin assembly and associated methods

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10332778
APP PUB NO 20170133260A1
SERIAL NO

14977554

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A substrate lift pin assembly includes a tubular support member connected to a bottom of a pedestal beneath a lift pin through-hole. The tubular support member has an interior cavity and an end closure with a cartridge through-hole extending through the end closure. A cartridge member includes a lift pin holder portion and a plunger portion. The lift pin holder portion is located inside of the interior cavity of the tubular support member. The plunger portion extends through the cartridge through-hole of the end closure of the tubular support member. A lift pin extends through the lift pin through-hole and connects to the lift pin holder portion of the cartridge member. A handle member connects to the plunger portion of the cartridge member at a location near a distal end of the plunger portion relative to the tubular support member. The handle member is configured to engage a lifting mechanism.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • LAM RESEARCH CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Gytri, Lisa Marie Sherwood, US 3 29
Janicki, Michael J West Linn, US 13 148
Pohl, Erica Sherwood, US 1 10
Womack, Jeffrey Lake Oswego, US 5 18

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 25, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 25, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00