Unit for processing blanks provided with an optical confinement section having convergent walls

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10137627
APP PUB NO 20170136682A1
SERIAL NO

15127311

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The unit (1) for processing hollow-body plastic blanks (2) includes a chamber (6) wherein the blanks (2) move along a predetermined path. The chamber (6) is defined, on both sides of the path, by two side walls (3, 4) having inner surfaces (5) that face each other. The chamber (6) includes a main section (9) wherein at least one of the walls (3, 4) is provided with a plurality of electromagnetic radiation sources (10). The side walls (3, 4) define therebetween, on at least one end of the chamber, an opening (8) for the preforms to pass therethrough. The chamber (6) includes at least one optical confinement section (12) that extends between the main section (9) and the opening (8) and wherein the inner surfaces (5) of the side walls (3, 4) are optically reflective and converge toward the opening (8).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SIDEL PARTICIPATIONS

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Feuilloley, Guy Octeville sur Mer, FR 49 281
Lahogue, Yoann Octeville sur Mer, FR 9 13

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 27, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 27, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00