Stirrer for glass melting, and glass melting furnace

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10858276
APP PUB NO 20170137312A1
SERIAL NO

15129683

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A stirrer for glass melting which can be used over a prolonged life expectancy, while maintaining a high strength, even in an environment exposed to a high temperature and an oxygen-containing gas atmosphere for a long period of time, and can prevent the air bubbles from being mixed into the glass melt. A stirrer for glass melting is made of iridium or an iridium-based alloy, and has a rotary shaft and a stirring part, a surface region S1 of the surface of the rotary shaft above the stirring part is covered with a cylindrical cover, the cover has a two-layer structure in which an outer layer made of platinum or a platinum rhodium alloy and an inner layer made of platinum or a platinum rhodium alloy containing metal species are joined together, and oxide particles of metal species are precipitated in a dispersed state on a surface of the inner layer on an opposite side to a surface adjacent to the outer layer, wherein the stirrer for glass melting has a pipe made of iridium or an iridium-based alloy which surrounds at least the surface region S2 of the cover from the lower end of the cover to a predetermined height at an interval.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • FURUYA METAL CO. LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hoshino, Akinori Toyko, JP 33 187

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 8, 2024
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 8, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 8, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00