Laminated hard film and cutting tool

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10309017
APP PUB NO 20170152602A1
SERIAL NO

15318612

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A laminated hard coating comprising a layer A and a layer B, wherein the layer A and the layer B differ in composition and are laminated. Layer A contains (MaAlbCrcTad)(BxCyNz) and satisfies 0≤a≤0.35, 0.05≤d≤0.35, 0≤x≤0.15, 0≤y≤0.50, a+b+c+d=1, and x+y+z=1. M is at least one element selected from the group consisting of V, Nb, Mo, and W; a, b, c and d represent the atomic ratios of M, Al, Cr, and Ta, respectively; and x, y, and z represent the atomic ratios of B, C and N, respectively. The layer B comprises (TiαSiβ)(BxCyNz) and satisfies 0.05≤β≤0.35, 0≤x≤0.15, 0≤y≤0.50, α+β=1, and x+y+z=1. α and β represent the atomic ratios of Ti and Si, respectively, and x, y, and z represent the atomic ratios of B, C, and N, respectively. One or more layers of each of these layers have been alternately laminated.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • KOBE STEEL, LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Abe, Maiko Hyogo, JP 6 6
Nii, Hiroaki Hyogo, JP 12 29
Yamamoto, Kenji Hyogo, JP 731 7284

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 4, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 4, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00