LDPC Erasure Decoding for Flash Memories

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10230406
APP PUB NO 20170155409A1
SERIAL NO

14594165

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A Solid-State Disk (SSD) controller uses LDPC decoding to enable flash memory accesses with improved latency and/or error correction capabilities. With SLC flash memory having a BER less than a predetermined value, the SSD controller uses a 1-bit read (single read) hard-decision LDPC decoder to access the flash memory. If the hard-decision LDPC decoder detects an uncorrectable error, then the SSD controller uses a 1.5-bit read (two reads) erasure-decision LDPC decoder to access the flash memory. With flash memory having a raw BER between two other predetermined values, the SSD controller omits the use of the hard-decision LDPC decoder and uses only the erasure-decision LDPC decoder to access the flash memory. Variations of the SSD controller similarly access MLC flash memory. Some SSD controllers dynamically switch between hard-decision and erasure-based decoders based on dynamic decoder selection criteria.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SEAGATE TECHNOLOGY LLC

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cohen, Earl T Oakland, US 158 7192
Danilak, Radoslav Cupertino, US 152 4153
Li, Yan San Jose, US 1329 19621
Zhong, Hao Milpitas, US 71 1866

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 12, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 12, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00