METHOD FOR FORECASTING FLOODS FOR MULTIPLE LEAD TIMES

Number of patents in Portfolio can not be more than 2000

United States of America Patent

SERIAL NO

15377974

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for forecasting flood, the method including: 1) collecting historical flood information, estimating a mean concentration time of a basin, and determining a length of a lead time; 2) establishing hydrological models, inputting hydrological variables including precipitation and evaporation to the hydrological models while neglecting the precipitation within lead times; 3) determining an objective function, which is a sum of squared errors between a forecasted streamflow and an observed streamflow within multiple lead times, and utilizing optimized algorithms to calibrate hydrological model parameters; and 4) selecting criteria to evaluate forecasting performance of the hydrological model including a Nash-Sutcliffe efficiency, a root mean square error, a water balance index, a qualified rate of peak flow, and a qualified rate of a peak time.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
WUHAN UNIVERSITY430072 NO 299 BAYI ROAD WUCHANG DISTRICT HUBEI WUHAN WUHAN CITY HUBEI PROVINCE 430072

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
DENG, Chao Wuhan, CN 20 51
LIU, Pan Wuhan, CN 68 328
ZHAO, Yan Wuhan, CN 300 2671

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation