Piston manufacturing device, piston manufacturing method, piston and disc brake

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10247269
APP PUB NO 20170175836A1
SERIAL NO

15325798

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A piston manufacturing device includes a first forming device (42) configured to form an annular groove (61) in a piston (11), and a second forming device (52) configured to press an edge (15) of an opening (14) of the piston (11) toward other end side in an axial direction of the piston (11) and to form a thick section (65) extruded from an inner circumferential surface (12b) arranged between the edge (15) and the groove (61) toward an axial center side of the piston (11), wherein a recessed section (53) is formed at a portion of the second forming device (52) that is arranged to abut the edge (15) so that an inner circumferential side of the edge (15) is plastically deformed toward the other end side in an axial direction of the piston (11).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HITACHI ASTEMO LTD2520 TAKABA HITACHINAKA-SHI IBARAKI

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Iwai, Yoshinari Kai, JP 2 8
Okita, Hiroshi Kawasaki, JP 18 140

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 2, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 2, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00