Fuel cell system and method of controlling of a fuel cell system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10181727
APP PUB NO 20170207634A1
SERIAL NO

15401397

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A controller of a fuel cell system performs a starting operation that switches on a first precharge circuit so as to reduce a voltage difference between a first smoothing capacitor and a second smoothing capacitor and subsequently turns on a first relay, when a start switch is turned on in a system off state that the first relay is off. Upon satisfaction of a predetermined condition including at least one of a condition that a difference between the voltage of the first smoothing capacitor and the voltage of the second smoothing capacitor is equal to or greater than a first reference value and a condition that the voltage of the first smoothing capacitor is equal to or higher than a second reference value, the controller uses a second converter to charge the second smoothing capacitor so as to bring the voltage of the second smoothing capacitor closer to the voltage of the first smoothing capacitor, and subsequently switches the first precharge circuit from off to on. This configuration reduces the electric current flowing through a precharge circuit at the time of starting the fuel cell system.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • TOYOTA JIDOSHA KABUSHIKI KAISHA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Imanishi, Masahiro Gotemba, JP 43 139
Katano, Koji Toyota, JP 90 382

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 15, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 15, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00