Multi-purpose utility vehicle for construction and snow-removing work

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10328794
APP PUB NO 20170225563A1
SERIAL NO

15416001

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A multi-purpose utility vehicle for construction and snow-removing work includes: a cargo box seated on a loading frame in the rear part of the vehicle; a continuously variable transmission combination mounted in a mounting space partitioned by a midship frame in the middle of a vehicle body; an engine assembly mounted in an engine room partitioned by a loading frame and base frames of the vehicle body at the back of the midship frame; a front wheel propeller shaft and a rear wheel propeller shaft which respectively transfer driving power outputted from the continuously variable transmission combination to a front axle combination of a front end of the vehicle body and a rear axle combination of a rear end of the vehicle body; and a PTO electromotive system extending from the front of the continuously variable transmission combination to the front of the vehicle body.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DAEDONG INDUSTRIAL CO LTD1-12 BUK-RI NONGONG-EUP DALSUNG-GUN DAEGU 711-857

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hwang, Jin Ho Changnyeong-gun, KR 143 186

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 25, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 25, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00