Computing infrastructure optimizations based on tension levels between computing infrastructure nodes

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9918146
SERIAL NO

15018211

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system comprises a scoring engine comprising at least one processor and memory. The scoring engine is to generate, based on telemetry information obtained from a plurality of nodes of a computing infrastructure, a first availability score for a first node of the plurality of computing infrastructure nodes and a second availability score for a second node of the plurality of computing infrastructure nodes. The scoring engine is further to generate, based on the first availability score of the first computing infrastructure node and the second availability score of the second computing infrastructure node, an edge tension score for a link between the first node and the second node.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • INTEL CORPORATION

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Butler, Joseph Stamullen, IE 108 894
Estrada, Giovani Dublin, IE 15 197
Leckey, Alexander Kilcock, IE 16 211
Metsch, Thijs Cologne, DE 36 288
Rana, Annie Ibrahim Dublin, IE 6 22
Riccobene, Vincenzo Mario Leixlip, IE 2 17

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 13, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 13, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00