Apparatuses for producing optical effect layers

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11065866
APP PUB NO 20170232727A1
SERIAL NO

15328823

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The apparatus and methods of the present disclosure relate to devices comprising spinning magnets driven by electric motors for use with printing or coating equipment. These devices and methods are for orienting magnetic or magnetisable pigment particles in an unhardened coating composition on a substrate. Specifically, these devices and methods are for producing optical effect layers. The apparatus comprises a holder, onto which is mounted a motor and a permanent magnet assembly. The motor is configured to spin the permanent magnet assembly. The holder is configured to be removably fixed to a base of a rotating magnetic cylinder (RMC) or a flatbed printing unit.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SICPA HOLDING SA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Degott, Pierre Crissier, CH 66 874
Despland, Claude-Alain Prilly, CH 64 563
Loginov, Evgeny Renens, CH 36 233
Muller, Edgar Lausanne, CH 36 577
Schmid, Mathieu Lausanne, CH 48 387

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 20, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 20, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 20, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00