Photocatalytic composition that comprises metal particles and two semiconductors including one made of indium oxide

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10695753
APP PUB NO 20170239647A1
SERIAL NO

15518931

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to a composition that contains a first semiconductor SC1, particles that comprise one or more element(s) M in the metal state selected from among an element of groups IVB, VB, VIB, VIIB, VIIIB, IB, IIB, IIIA, IVA and VA of the periodic table, and a second semiconductor SC2 that comprises indium oxide, with said first semiconductor SC1 being in direct contact with said particles that comprise one or more element(s) M in the metal state, with said particles being in direct contact with said second semiconductor SC2 that comprises indium oxide in such a way that the second semiconductor SC2 covers at least 50% of the surfaces of the particles that comprise one or more element(s) M in the metal state. The invention also relates to its preparation method as well as its application of photocatalysis.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CENTRE NATIONAL DE LA RECHERCHE SCIENTIFIQUE3 RUE MICHEL ANGE PARIS 75016
IFP ENERGIES NOUVELLES1 & 4 AVENUE DU BOIS-PREAU RUEIL-MALMAISON CEDEX 92852
UNIVERSITE CLAUDE BERNARD - LYON 169100 VILLEURBANNE

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fecant, Antoine Brignais, FR 45 68
Geantet, Christophe Miribel, FR 13 76
Lofficial, Dina Villeurbanne, FR 3 3
Puzenat, Eric Lyons, FR 8 10
Uzio, Denis Oullins, FR 46 361

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 30, 2023
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 30, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 30, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00