SOI integrated circuit equipped with a device for protecting against electrostatic discharges

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10062681
APP PUB NO 20170256531A1
SERIAL NO

15591565

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A protection device for protecting an IC against electrostatic discharge includes a buried insulant layer having a thickness that is no greater than fifty nanometers with bipolar transistors arranged thereon, one of which is NPN and the other of which is PNP. A base of one merges with a collector of the other. The transistors selectively conduct a discharge current between electrodes. A first semiconductor ground plane under the buried insulant layer is capable of being electrically biased and extends underneath the base of the first bipolar transistor. The ground plane and a base of one transistor have the same doping. However, its dopant density is at least tenfold greater than that of the base.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
STMICROELECTRONICS FRANCE29 BOULEVARD ROMAIN ROLLAND MONROUGE 92120

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cristoloveanu, Sorin Seyssinet Pariset, FR 9 73
Fenouillet-Beranger, Claire Voiron, FR 37 293
Fonteneau, Pascal Theys, FR 25 76
Solaro, Yohann Grenoble, FR 6 16

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 28, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 28, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00