Surface-coated cutting tool and method of manufacturing the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9849517
SERIAL NO

15102992

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A surface-coated cutting tool includes a base material and a coating formed on the base material. The coating includes an α-Al2O3 layer containing a plurality of α-Al2O3 crystal grains. The α-Al2O3 layer includes: a first region made up of an edge ridgeline, a region A of a rake face, and a region B of a flank face; a second region which is a region of the rake face except for the region A and covered with the coating; and a third region which is a region of the flank face except for the region B. The α-Al2O3 layer satisfies a relation b−a>0.5, where a is an average value of a TC(006) in the first region in texture coefficient TC(hkl) and b is an average value of the TC(006) in the second region or the third region in texture coefficient TC(hkl).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SUMITOMO ELECTRIC HARDMETAL CORP.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Detani, Takanori Sorachi-gun, JP 12 59
Imamura, Shinya Sorachi-gun, JP 107 565
Kanaoka, Hideaki Sorachi-gun, JP 37 123
Paseuth, Anongsack Sorachi-gun, JP 76 150

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 26, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 26, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00