Insulation structure for splice portion, harness mounting plate, and wiring unit

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10069286
APP PUB NO 20170264088A1
SERIAL NO

15529834

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An insulation structure for a splice portion, a harness mounting plate, and a wiring unit that are capable of reducing labor-hours that are required when insulating a splice portion where a plurality of electrical wires are connected by a splice terminal. A plurality of electrical wires are connected by a splice terminal, wherein an opening portion that allows the splice portion to be inserted thereinto and removed therefrom is formed in a splice housing portion that surrounds and insulates the splice portion, and the insulation structure is provided with a separation restricting portion that restricts the splice portion that is housed in the splice housing portion from becoming separated from the opening portion.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • AUTONETWORKS TECHNOLOGIES, LTD.; SUMITOMO WIRING SYSTEMS, LTD.; SUMITOMO ELECTRIC INDUSTRIES, LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Maki, Tomohide Mie, JP 9 39
Nakayama, Osamu Mie, JP 163 1021
Sone, Kosuke Mie, JP 57 102
Tanaka, Tetsuji Mie, JP 103 765

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 4, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 4, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00