System for extracting a substance from a commodity

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10757962
APP PUB NO 20170265513A1
SERIAL NO

15611914

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system 400 for obtaining a substance from a commodity has a first apparatus 420 with first 422 and second 424 openings, a device 426 for moving the commodity through the first apparatus, and at least one blade 428 for shearing the commodity. The at least one blade 428 is positioned between the first opening 422 and the second opening 424. A second apparatus 440 has a first opening 442 and a second opening 444, with the first opening 442 being fluidly connected to the second opening 424 of the first apparatus 420. The second apparatus 440 includes a device 446 for moving the sheared commodity from the second apparatus first opening 442 to the second opening 444. A third apparatus 460 obtains the substance from the sheared commodity, including a separator 460 having a first opening 462 fluidly connected to the second opening 444 of the second apparatus 440.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • Assignment data not available. Check PTO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Christodoulou, Spyros Larnaca, CY 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 1, 2024
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 1, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 1, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00