Disc brake device and disc brake for railway

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10807619
APP PUB NO 20170267262A1
SERIAL NO

15504819

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In a disc brake apparatus, a parallelism maintaining control mechanism for pressing lining surfaces of pads against a disc rotor in parallel includes a pressure plate which is brought into abutment with a pad holding member, a link arm having a fixing shaft projecting from a caliper body in parallel to a side surface of a disc rotor, a moving shaft disposed in parallel to the fixing shaft and pivotally supporting the pressure plate, joint members which connect the fixing shaft and the moving shaft in parallel to each other and a connecting shaft for pivotally connecting the joint members to each other, and a spring member for pressing the pressure plate against the pad holding member.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • AKEBONO BRAKE INDUSTRY CO LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Harigai, Yoshikazu Tokyo, JP 4 4
Yamazaki, Akihiko Tokyo, JP 41 327

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 20, 2024
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 20, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 20, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00