Fuel supply devices

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10753328
APP PUB NO 20170268470A1
SERIAL NO

15505150

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A fuel supply device has a cover member which is attached to an opening of a fuel tank, a pump unit provided with a pump, and a connecting portion for connecting the cover member and the pump unit. The fuel supply device has a connecting shaft which is formed on either one of the connecting portion or the pump unit, and a connecting hole which is formed on the other. The fuel supply device has a guide mechanism which can guide the pump unit. The guide mechanism includes a first guide portion formed at the connecting portion and a second guide portion formed at the pump unit. One of the first guide portion or the second guide portion includes a protruding portion which protrudes in a position spaced apart from the connecting shaft. The other guide portion is formed to restrict a movable range of the protruding portion.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
AISAN KOGYO KABUSHIKI KAISHA1-1 KYOWA-CHO 1-CHOME OBU-SHI AICHI 474-8588

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fukui, Tatsuki Nagoya, JP 70 640
Higashi, Shinya Kasugai, JP 35 811
Kondo, Takayuki Inazawa, JP 159 1839
Kono, Takuya Nagoya, JP 52 248
Murakoshi, Yuichi Inazawa, JP 10 76
Yano, Akihiro Obu, JP 45 974
Yoshida, Koji Kasugai, JP 460 5264

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 25, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 25, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00