Additive manufacturing vertical stage for moving photocured material in a non-perpendicular direction from the image plane

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10479068
APP PUB NO 20170274601A1
SERIAL NO

15467600

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

There is provided an additive manufacturing system comprising a vertical stage (also known as a z-stage) that moves the object being created along an axis of motion that is not perpendicular to the image plane (non-parallel to the z-axis of the image plane). By moving the build platform, upon which the additively manufactured object is being supported, along a predetermined axis of motion, such as one adapted to the dominant axis of the object design, the additive manufacturing system is capable of making larger objects, shortening build times, improving part resolution, and/or reducing the volume of photocurable material needed, among other benefits.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • 3D SYSTEMS, INC.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Astle, Seth Berkeley, US 3 15
Dunne, Patrick Lafayette, US 16 331
Turner, Peter Scott Venice, US 12 37

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 19, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 19, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00