Molding unit for blow molding containers, equipped with a guiding wear ring

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10322539
APP PUB NO 20170291346A1
SERIAL NO

15508136

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A molding unit (1) for blow molding a container from a parison, the container including a wall portion and a base, the molding unit (1) including:

    a mold sidewall (2) extending along a main axis (X) and having an inner molding surface (3) defining a counter print of the wall portion of the container, and an opening (8) at a lower end of the inner molding surface (3),a cylinder jacket (10) fixed to the mold sidewall (2) and extending axially below the opening (8);a movable mold base (14) having a cylindrical bracket (17) slidingly received within the cylinder jacket (10) and a body (15) axially protruding from the bracket (17),a wear ring (33) fixed to the mold base (14), the wear ring (33) including a cylindrical guiding bushing (34) interposed between the bracket (17) and the cylinder jacket (10).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SIDEL PARTICIPATIONS

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Barbey, Arnaud Octeville-sur-Mer, FR 3 0
Bourdel, Yves Octeville-sur-Mer, FR 1 0
Breard, Mathieu Octeville-sur-Mer, FR 1 0
Leroux, Marc Octeville-sur-Mer, FR 15 88

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 18, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 18, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00