Implement steering system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9926007
SERIAL NO

15093325

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In one embodiment, a steering system for an agricultural implement system includes a first actuating cylinder configured to rotate a first track relative to an implement frame where the first actuating cylinder is connected to a first frame of the first track, and a second actuating cylinder configured to rotate a second track relative to the implement frame where the second actuating cylinder is connected to a second frame of the second track. The steering system also includes a first fluid control conduit extending to a cap end of the first actuating cylinder, a second fluid control conduit extending between a rod end of the first actuating cylinder and a rod end of the second actuating cylinder, a third fluid control conduit extending to a cap end of the second actuating cylinder, and a steering control valve in fluid communication with the first and third fluid control conduits.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • CNH INDUSTRIAL AMERICA LLC

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Maniar, Alihaider Skokie, US 3 27
Prickel, Marvin A Homer Glen, US 90 748
Prodduturi, Shivakumar Naperville, US 5 23

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 27, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 27, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00