Connection device for a modular computing system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10127052
APP PUB NO 20170300343A1
SERIAL NO

15130360

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Systems and methods of controlling operation of a connection device associated with a modular computing system are disclosed. For instance, data indicative of a connection between a first connection device and a second connection device can be obtained. The first connection device can be associated with a modular computing device, and the second connection device can be associated with a modular component to be implemented within the modular computing device. Each connection device can include a plurality of connector elements. Data indicative of one or more configuration parameters of the second connection device can be obtained. An operating configuration of the first connection device can be determined based at least in part on the data indicative of the one or more configuration parameters. Operation of the first connection device can be controlled based at least in part on the operating configuration.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • GOOGLE LLC

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Brune, Kevin D Maple Valley, US 15 52
Liu, Eric HC Redwood City, US 68 551
Schooley, Stephen Menlo Park, US 4 113

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 13, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 13, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00