Station-building power-supply device and method of calculating regeneration determining voltage value

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10351018
APP PUB NO 20170305300A1
SERIAL NO

15523464

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A station-building power-supply device includes: a detector that detects a ripple in an overhead line voltage and outputs information on the detected ripple and an overhead line voltage value; a determiner that compares the information with a threshold for determining whether a ripple is in the overhead line voltage, and outputs the overhead line voltage value obtained when a ripple is determined to be not in the overhead line voltage based on the comparison result; an estimator that estimates, based on the overhead line voltage value, a no-load voltage value of an overhead line in a no-load state; a controller that sets an additional value; and a calculator that adds the additional value to the no-load voltage value to calculate a regeneration determining voltage value for determining whether an electric vehicle performs regeneration, and outputs the regeneration determining voltage value to a circuit that utilizes energy generated by the regeneration.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • MITSUBISHI ELECTRIC CORPORATION

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Katsumata, Hisashi Tokyo, JP 4 13
Matsumura, Yasushi Tokyo, JP 78 652

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 16, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 16, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00