Planetary gearing

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10240670
APP PUB NO 20170307064A1
SERIAL NO

15492557

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A planetary transmission includes a planetary gear set (1), another planetary gear set (2), a fluid line (3) through which fluid is flowable to the planetary gear set (1) and to the other planetary gear set (2), and a fluid collecting device (4) which is in fluid communication with the fluid line (3). The fluid collecting device (4) is connected in a rotationally fixed manner to the planetary gear set (1). The fluid collecting device (4) is configured for dividing the fluid from the fluid line (3) which has flowed into the fluid collecting device (4) into a fluid part which is flowable to the planetary gear set (1) and another fluid part which is flowable to the other planetary gear set (2).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • ZF FRIEDRICHSHAFEN AG

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Brehmer, Martin Tettnang, DE 135 1978
Führer, Kim Lindau, DE 13 10
Geiger, Andreas Markdorf, DE 33 438
Müller, Thorsten Friedrichshafen, DE 22 86
Riedisser, Thomas Lindau, DE 20 12
Schilling, Carl Weingarten, DE 7 7

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 26, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 26, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00