Wavelength conversion member including phosphor

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10365551
APP PUB NO 20170307968A1
SERIAL NO

15468179

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A wavelength conversion member comprises: a substrate; and a wavelength conversion layer. The wavelength conversion layer contains a first phosphor and a second phosphor. The second phosphor has a higher thermal conductivity than the first phosphor. In the wavelength conversion layer, a volume of the second phosphor is larger than a volume of the first phosphor. The wavelength conversion layer includes a first portion and a second portion. The first portion is located closer to the substrate than the second portion, and is in direct contact with the second portion. Thicknesses of the first portion and the second portion are equal to each other. A volume V11 of the first phosphor in the first portion, a volume V12 of the second phosphor in the first portion, a volume V21 of the first phosphor in the second portion, and a volume V22 of the second phosphor in the second portion satisfy V11/V12

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • PANASONIC CORPORATION

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Nagasaki, Yoshihisa Osaka, JP 44 194
Ohbayashi, Takashi Osaka, JP 23 139
Okuyama, Kojiro Nara, JP 61 239

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 30, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 30, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00