Method, apparatus, and system for metal-oxide-semiconductor field-effect transistor (MOSFET) with electrostatic discharge (ESD) protection

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10115718
APP PUB NO 20170309615A1
SERIAL NO

15134942

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Methods, apparatus, and systems relating to a MOSFET with ESD resistance, specifically, to a semiconductor device comprising a field-effect transistor (FET) comprising a gate, a source, and a drain, all extending parallel to each other in a first direction; at least one source electrostatic discharge (ESD) protection circuit; a source terminal disposed above and in electrical contact with the at least one source ESD protection circuit, wherein the source terminal extends in the first direction; at least one drain ESD protection circuit; and a drain terminal disposed above and in electrical contact with the at least one drain ESD protection circuit, wherein the drain terminal extends in the first direction.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • GLOBALFOUNDRIES INC.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lee, Chien-Hsin Malta, US 51 241
Natarajan, Mahadeva Iyer Clifton Park, US 37 136
Prabhu, Manjunatha Malta, US 31 63

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 30, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 30, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00