AC rotary machine control apparatus

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10135380
APP PUB NO 20170310267A1
SERIAL NO

15443124

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An AC rotary machine control apparatus is provided with: predriver ICs for giving drive signals to the gates of power converting switching elements bridge-connected to the respective phases of an AC rotary machine; predriver IC output cutting-off switching elements for operating on the basis of a cut-off signal from a calculation processing device having detected an abnormality state of the predriver ICs, and cutting off drive signals given from the predriver ICs to the gates of the power converting switching elements; and a gate driver circuit for becoming conductive on the basis of a signal from the calculation processing device and giving drive signals from a power source circuit to all the gates of the lower arm elements of the power converting switching elements, when drive signals from the predriver Ics are being cut off by the predriver IC output cutting-off switching elements.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • MITSUBISHI ELECTRIC CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Date, Toshiaki Tokyo, JP 21 157
Fujiwara, Michitaka Hyogo, JP 14 59

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 20, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 20, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00