Power supply structure

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10251294
APP PUB NO 20170311471A1
SERIAL NO

15487513

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A load board includes an electronic component and first wiring connected thereto. A power supply board includes a DC/DC converter and second wiring connected thereto. A bus block includes prismatic block-shaped conductors arranged with a gap interposed therebetween and fixed. The bus block is held between the first plate member and the second plate member such that the end faces of the block-shaped conductors are in contact with the load board and the power supply board. The bus block is connected to the first wiring and the second wiring such that current flows in a direction from the power supply board to the load board in one of two adjacent block-shaped conductors and that current flows in a direction from the load board to the power supply board in the other block-shaped conductor.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • FUJITSU LIMITED

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kawano, Kayoko Kawasaki, JP 6 70
Mao, Xuelong Kawasaki, JP 1 0
Mori, Hirofumi Yokohama, JP 52 352
Murakami, Hajime Kawasaki, JP 87 1296
Tagishi, Katsuhiko Yokohama, JP 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 2, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 2, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00