Systems and methods for preloading a bearing

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9987732
SERIAL NO

15661808

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system for providing a load on a bearing mounted to a shaft includes an attaching member releasably connectable to the shaft and a press mechanism in fluid communication with a source of fluid and configured to provide a compressive load to the bearing. The press mechanism includes a switch having a base and a piston in communication with the fluid such that an increase in a pressure of the fluid results in the piston extending upwardly from the base and a decrease in the pressure of the fluid results in the piston retracting toward the base. The switch includes a lower proximity sensor and a higher proximity sensor. The piston is configured to extend upwardly from the base past the lower proximity sensor and to trip the higher proximity sensor. The switch is configured to control the increase in the pressure in response to the piston tripping the higher proximity sensor.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • TEMPER AXLE PRODUCTS CORPORATION

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Rode, John E Fonda, US 101 1683
Strait, Sean E Fort Plain, US 30 339

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 5, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 5, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00