Supply rail for a motor vehicle

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10279760
APP PUB NO 20170320454A1
SERIAL NO

15661714

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A supply rail for a vehicle includes a first busbar which is designed to provide electrical energy with a first supply voltage for supplying energy to a large number of electrical modules of the vehicle. In this case, the electrical modules of the large number of electrical modules are arranged at different points of the vehicle. The supply rail includes means for data transmission designed to allow data interchange between at least two of the large number of electrical modules. The supply rail has a large number of slots for the large number of electrical modules, wherein a first slot of the large number of slots is designed to connect a first electrical module of the large number of electrical modules to the first busbar and to the means for data transmission by way of a first plug connection. The supply rail includes a temperature-control duct which is designed to conduct a thermally conductive medium past the large number of electrical modules.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • BAYERISCHE MOTOREN WERKE AKTIENGESELLSCHAFT

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Froeschl, Joachim Herrsching, DE 37 142

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 7, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 7, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00