Human factors approach to control contaminant concentrations in aircraft supply air from engine and APU bleed air and ground air sources, and in recirculated air being delivered to aircraft cabins for the optimization of user experience and energy consumption

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9896215
SERIAL NO

15661348

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An Environmental Control System includes a sensor, an air purification subsystem, and a controller in communication with the sensor and air purification subsystem. The sensor detects a contaminant in the air and generates a contaminant signal. The controller compares the contaminant signal to a predicted sensory response threshold. When the contaminant signal reaches the predicted sensory response threshold, the controller commands the air purification subsystem to alter a condition in the air.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • HONEYWELL INTERNATIONAL INC.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chase, Deanna P Tempe, US 4 32
Fox, Richard B San Tan Valley, US 67 1135
Hagh, Bijan F Newport Beach, US 14 204
Johnson, Russell W Elmhurst, US 64 1123
Koerner, Mike Rancho Palos Verdes, US 9 102
Kurlak, Paul Scottsdale, US 6 32
Michalakos, Peter M Arlington Heights, US 33 465
Yates, Stephen South Barrington, US 36 270

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 20, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 20, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00